Express + expert help

View pricing →
Skip to main content
tutorialREACH4 min read

REACH Article 33 and SCIP for Electronics Manufacturers

Separate REACH Article 33 communication from SCIP notification and trace Candidate List substance evidence through electronic assemblies.

By Cenitia

REACH Article 33 communication and SCIP notification are related obligations, but they are not the same task. Start by identifying the articles in your product, the Candidate List substance evidence and your role in the supply chain; then determine which communication and notification duties apply.

Use the REACH and SCIP review sheet. This is a decision preparation tool for electronics assemblies, not a substance assessment or a submitted SCIP dossier.

REACH Article 33 addresses information about Candidate List substances in articles above 0.1% weight by weight. It distinguishes communication to recipients from responding to consumer requests; the latter has a 45 day deadline. Consult REACH Article 33 and ECHA's communication guidance.

SCIP derives from the Waste Framework Directive's Article 9(1)(i). ECHA explains the notification obligation for relevant suppliers of articles containing Candidate List substances above that threshold and the exclusion for supply directly and exclusively to consumers. Do not extend that exclusion to every business with retail customers. See ECHA's supplier information and the Waste Framework Directive.

A notification in SCIP does not replace the information you need to communicate through the supply chain. Similarly, a supplier declaration does not prove that your own applicable notification task is complete.

Identify the article boundary before calculating concentration

An electronic assembly can be a complex object containing multiple articles. You need the relevant article boundary; diluting a substance across the mass of the complete appliance can produce the wrong conclusion.

In a fictional example, a metal insert weighs 2 grams and contains 0.004 grams of a Candidate List substance. Under the stated assumption that the insert is the relevant article, its concentration is 0.2%, above 0.1%. Dividing by the 500 gram mass of the complete device would obscure that result.

This is arithmetic using invented inputs. It does not decide whether a real insert is an article or establish its composition. A materials specialist must review the boundary and actual supplier evidence.

Ask suppliers questions that can be answered

Information neededWhy it matters
Covered part number and revisionConnects the response to your actual assembly
Candidate List reference dateIndicates which list the assessment addressed
Substance identity and applicable articlePrevents an unscoped yes/no declaration
Concentration information or categorySupports the threshold and dossier review
Safe use informationSupports the relevant communication task
Existing SCIP references and relationshipCan support preparation without assuming they resolve your role

Do not treat “REACH compliant” as a complete response. Ask which articles and list version were assessed, what limitations remain and who owns changes. If a supplier cannot provide data, record the gap and decide what additional investigation is necessary.

Build the notification decision from your actual role

Identify the entity producing, importing or supplying the article in the EU. Record whether supply is business to business, directly and exclusively to consumers, or mixed. Have the responsible specialist assess the applicable national implementation and ECHA requirements.

For an assembly, preserve the component hierarchy and identifiers needed to understand where the substance-containing article sits. Avoid flattening the record into one generic “electronics” line that cannot be connected to the finished product.

Use the official SCIP database resources to prepare the current data structure. This tutorial does not submit a SCIP dossier. Check the current ECHA field definitions and validation rules when preparing your own submission.

Maintain the record after the first shipment

Candidate List changes, supplier substitutions and new evidence can change the decision. Assign an owner to check updates and affected BOMs. Record the date of each review rather than claiming a timeless “SVHC free” status.

RoHS and REACH use different substances, scopes and assessment concepts. A RoHS declaration does not automatically answer the Article 33 or SCIP questions.

No chemical result or actual customer notification is claimed.

Continue reading

Related guides

Put this into practice

Free tools & references

New to the terminology? Browse the compliance glossary — plain-English, citation-backed definitions of every term above.