Express + expert help

View pricing →
Skip to main content
tutorialCEMark, CRA, RED, MDR8 min read

How to check NANDO for Notified Bodies

Step-by-step guide to NANDO, the Commission's public list of notified bodies: search by legislation, country or body number and verify the body quoted on a DoC.

By Vladimír VicianUpdated

Fact-checked against the law as of Reviewed by Vladimír Vician on How we check

If a Declaration of Conformity quotes "Notified Body 0123" or any other 4-digit number, you need to be able to confirm three things: that the body exists, that it is notified for the legal act and procedure cited, and that the notification was active on the date of the certificate. The place to do all three is NANDO, the notified-bodies section of the Commission's Single Market Compliance Space. The older address, ec.europa.eu/growth/tools-databases/nando, redirects to the home page of the Space. The Commission's notified bodies page says the lists include the identification number of each notified body and the tasks for which it has been notified.

NANDO is named in primary law. Article 43(2) of the Cyber Resilience Act requires the notifying authority to notify the Commission and the other Member States "using the New Approach Notified and Designated Organisations information system developed and managed by the Commission." Article 42(2) of Regulation (EU) 2017/745 (MDR) names NANDO as well. Older New Legislative Framework acts describe the system without naming it: Article 30(2) of Directive 2014/53/EU (RED) requires notification "using the electronic notification tool developed and managed by the Commission", and Article 31(2) requires the Commission to publish the list of notified bodies with their identification numbers and the activities for which they have been notified.

Three ways to search NANDO

The Notified Bodies menu offers three searches. Pick the one that matches what you already know.

SearchWhen to useWhat you get
Free searchYou have the 4-digit number or the name from a CE marking, DoC or certificateFilters for notification status, body number, body name, legislation, article/annex, procedure and products; click the body name to open its record
Search by legislationYou need a body for a specific directive or regulationThe bodies notified under that act
Search by countryYou want a body established in a particular countryThe bodies notified by that country

Search by legislation is how you find candidates. A radio-equipment manufacturer that needs an EU-type examination (RED Annex III, Module B) for the Article 3(3) cybersecurity requirements, for example, selects "2014/53/EU Radio equipment" and then checks each candidate's notification for the essential requirement and procedure it needs (see the notified-body procedures under the RED). The free search is how you verify a specific quoted number.

Reading a body's record

Click a body name and you see two blocks. Organization details gives the body's name, address, country, contact details, body number and last approval date. List of notifications has one row per legal act the body is notified under, with an end date where one applies and a PDF of the notification.

Click a legal act to open the Notification details. For the RED, the notified items are listed row by row under these headings:

  • Essential requirements — for example Article 3.1.a, 3.1.b, 3.2, 3.3.d, 3.3.e or 3.3.f.
  • Procedures — the conformity assessment module, for example Module B. The modules come from Decision No 768/2008/EC; see conformity assessment modules A to H for what each one entails.
  • Articles/Annexes — for example "Article 17 and Annex III".
  • Categories of radio equipment and Comments — product limits and any restriction on the scope.

Other acts use their own headings; an MDR designation, for example, is scoped by codes for conformity assessment activities and device types (MDR Article 42(3)).

The number is the same across all of a body's notifications: CRA Article 44(1) and RED Article 31(1) provide for a single number even where the body is notified under several acts. Scope is not the same. A body notified for RED Annex III (EU-type examination, Module B) is not thereby notified for RED Annex IV (full quality assurance, Module H), and a body notified for Article 3.2 is not thereby notified for Article 3.3.d. Match the essential requirement and the procedure on the certificate to the notified items, not just the legal act.

Status — Active, Suspended, Withdrawn, Expired

The Notification status filter offers Active, Withdrawn, Suspended, Expired and Expired/Withdrawn. The free search shows Active notifications by default, so a body whose notification has ended will not appear until you change the filter. The Commission's Blue Guide notes that the details of suspended or withdrawn notifications remain in the database.

The legal mechanism is set out in CRA Article 45(1): a notifying authority that finds a body no longer meets the requirements "shall restrict, suspend or withdraw notification as appropriate" and immediately inform the Commission and the other Member States. Equivalent provisions appear in RED Article 32 and MDR Article 46.

Practical implications:

  • Withdrawn or expired notification — the body can no longer issue certificates under that act. What happens to certificates already issued depends on the act. CRA Article 45(2) and RED Article 32(2) only govern the body's files, which must be processed by another notified body or kept available for the authorities. The Blue Guide (section 5.3.4) says that, without prejudice to sectoral rules, withdrawal does not affect certificates issued up to that point until it is shown that they should be withdrawn. Under MDR Article 46(9), certificates remain valid for nine months, and only if the competent authority confirms there is no safety issue and another notified body confirms in writing that it will take over and complete its assessment within twelve months; extensions are possible in three-month steps up to twelve months in total. Contact the notifying authority and line up another notified body straight away.
  • Suspended notification — confirm the scope and duration of the suspension with the notifying authority before relying on a recent certificate. For medical devices, MDR Article 46(8) sets conditions under which certificates remain valid during a suspension or restriction.
  • Status changes after issuance — check the notification as it stood on the certificate's issue date. The record keeps earlier versions of the body and of each notification, which is why dating your NANDO evidence matters.

Verifying a quoted Notified Body on a Declaration of Conformity

Where a notified body was involved, the Declaration of Conformity names it, gives its number and describes its intervention and certificate. Your verification checklist:

  1. Open Free search and enter the 4-digit number in Body number. If nothing comes up, change Notification status from Active.
  2. Confirm that the body's name on the DoC matches the NANDO record.
  3. In the List of notifications, open the legal act cited on the DoC (for example 2014/53/EU Radio equipment).
  4. Confirm that the essential requirement and the procedure on the certificate (for example Module B under Annex III, or Annex IV) are among the notified items.
  5. Confirm that the certificate's issue date falls within a period when the notification was active, using the approval and end dates and the version selector.
  6. Save a dated PDF of the NANDO record into the technical file.

If any step fails — a mistyped number, a body that is not notified for that procedure, a certificate issued after withdrawal — the conformity claim is not supported and market surveillance can challenge it.

Common mistakes

  • Trusting the 4-digit number without opening NANDO. A real number proves nothing about scope: it can belong to a body that is not notified for the act, requirement or procedure on the certificate. Open the notification details and compare.
  • Confusing "accredited" with "notified". A body can be accredited by a national accreditation body without being notified under a specific Union act. NANDO shows notifications; an accreditation certificate alone does not make a body a notified body.
  • Ignoring dates. A body whose notification was withdrawn in March cannot validly issue a certificate dated June. The issue date on the underlying certificate is what you compare with the notification period.
  • Reading scope by standard instead of by requirement. Bodies are notified per legal act, essential requirement, procedure and product category, not per harmonised standard. For RED cybersecurity, check that the notified items include Article 3.3.d, 3.3.e or 3.3.f as needed — a body notified for 3.3.d only is not competent for 3.3.e or 3.3.f. See the EN 18031 parts comparison for which requirement each part addresses.
  • Assuming a new notification is already effective. CRA Article 43(5) and RED Article 30(5) allow a body to act as a notified body only where no objections are raised within two weeks of the notification where an accreditation certificate is used, or within two months where it is not.
  • Assuming the CRA list is populated. On 22 November 2026 NANDO listed no active notified body under Regulation (EU) 2024/2847. Check the live list before you plan a notified-body route for an important or critical product.
Explore Cenitia’s compliance workflow

Review the supported scope and workflow

Further reading

FAQ

Frequently asked questions

  • What does NANDO stand for and who runs it?

    NANDO is the 'New Approach Notified and Designated Organisations' information system, developed and managed by the European Commission. Article 43(2) of Regulation (EU) 2024/2847 (CRA) names it as the system notifying authorities use to notify conformity assessment bodies, and Article 42(2) of Regulation (EU) 2017/745 (MDR) does the same for medical devices. Its public lists show each notified body's identification number and the tasks for which it has been notified. The website is now part of the Commission's Single Market Compliance Space.

  • What is the 4-digit Notified Body number?

    It is the identification number the Commission assigns to a notified body. Article 31(1) of Directive 2014/53/EU (RED) and Article 44(1) of Regulation (EU) 2024/2847 (CRA) both say the Commission assigns a single number even where the body is notified under several Union acts. The Commission's Blue Guide adds that the numbers are sequential and are not re-used when a body is withdrawn. Whether the number appears next to the CE marking depends on the act: under the RED it follows the CE marking only where the Annex IV full quality assurance procedure is applied (Article 20(3)).

  • Does NANDO list notified bodies for the Cyber Resilience Act yet?

    NANDO has an entry for Regulation (EU) 2024/2847, but on 22 November 2026 a search for active notifications under it returned no body. Chapter IV of the CRA, on notification of conformity assessment bodies, has applied since 11 June 2026, and Article 35(2) asks Member States to strive to ensure a sufficient number of notified bodies by 11 December 2026. Check the live list before planning a notified-body route for an important or critical product.

  • What happens to certificates if a Notified Body's notification is withdrawn?

    It depends on the act. Provisions such as Article 45(2) of the CRA and Article 32(2) of the RED deal with the body's files: the notifying Member State must ensure they are processed by another notified body or kept available for the authorities. The Commission's Blue Guide (section 5.3.4) says that, without prejudice to sectoral rules, suspension or withdrawal does not affect certificates already issued until it is shown that they should be withdrawn. Sectoral rules can be stricter: under Article 46(9) of the MDR, certificates stay valid for nine months, and only if the competent authority confirms there is no safety issue and another notified body confirms in writing that it takes over.

  • Why are non-EU bodies listed in NANDO?

    NANDO is not limited to EU Member States. Its results include bodies in EEA-EFTA states such as Norway, bodies in Türkiye and, under trade agreements, bodies in third countries such as Canada (shown as 'Canada (CETA)'). The site has separate sections for mutual recognition agreements, the EU–South Korea free trade agreement, the CETA Protocol on Conformity Assessment and the Windsor Framework. For a non-EU body, check under which arrangement and for which legal act it is listed.

  • Can a Notified Body sub-contract conformity assessment tasks?

    Yes, under the conditions of the act concerned: Article 28 of the RED, Article 41 of the CRA and Article 37 of the MDR. Under RED Article 28 the notified body must ensure that the subcontractor or subsidiary meets the requirements for notified bodies, takes full responsibility for the tasks, and may subcontract only with the agreement of the client. NANDO lists the notified body, not its subcontractors, so ask the body which tasks it subcontracts.

Continue reading

Related guides

Put this into practice

Free tools & references

New to the terminology? Browse the compliance glossary — plain-English, citation-backed definitions of every term above.